Green Wall Panels
Specification Guide
Version: 2.3 English
Application:
Modular Living Wall of Plants System
Eco Innovations Inc. o/a G-Sky
p (604) 708-0611 f (604) 357-1315
info@gsky.com
www.gsky.com
RECOMMENDED SPECIFICATION FOR
G-SKY GREEN WALL PANELS ATTACHED TO
VARIOUS WALL SURFACES
THIS SPECIFICATION IS INTENDED onLY TO PROVIDE A GENERAL UNDERSTANDING OF THE G-SKY GREEN WALL PANELS ASSEMBLY. IT IS RECOMMENDED THAT A G-SKY REPRESENTATIVE CONDUCT A TECHNICAL ANALYSIS BEFORE SYSTEM COMPOSITION, PLANT SELECTION AND PLANT LAYOUT ARE DETERMINED TO IDENTIFY ANY ADJUSTMENTS OR ADDITIONS TO SPECIFICATION REQUIREMENTS.
FOR A COMPLETE DESCRIPTION OF PRODUCTS AND APPLICABLE STANDARDS, PLEASE REFER TO THE PRODUCT DATA SHEETS (G-SKY – GREEN WALL & ROOF SPECIFICATIONS, CD-ROM OR on-LINE AT WWW.GSKY.COM).
PART I GENERAL
1.01 SUMMARY
A. This specification serves as a guideline and should be adapted to suit the needs of each individual project by the architect. It is prepared in accordance with the NMS three-part section format. Improvements and other changes to the contents may be made only with the written approval of the architect.
1.02 SCOPE
A. Furnish all labour, materials, tools and equipment to furnish and install Green Wall Panels System provided by G-Sky including Green Wall Panels and Frame, as shown on the Drawings or as directed by the Engineer. This work shall also include Irrigation Systems on the drawings.
1.03 RELATED WORK (Edit to project requirements)
NOTE: Specific Provisions: Top of the wall must allow 2¾” from the top of the wall, recessed encasement, or other installation medium to allow for the top securing clasp to be installed and easily accessed for future maintenance.
Refer to the Green Wall Panels Typical Specification Drawing or consult the G-Sky engineering department to draw up a plan illustrating where the abovementioned item is located (for project specific detailed drawings, consulting fees will apply).
A permanent drip irrigation system (G-Sky Irrigation) is required for all G-Sky Green Wall Panels System installations.
A. Section 02050 – Demolition
B. Section 02660 – Water Distribution
C. Section 02810 – Irrigation System
D. Section 02900 – Landscaping
E. Section 03300 – Concrete
F. Section 04100 – Masonry
G. Section 06100 – Carpentry
H. Section 07600 – Sheet Metal
I. Section 07900 – Caulking & Sealants
1.04 REFERENCES
A. ACI 301 Standard Specification for Structural Concrete
B. ACI 318 Building Code Requirements for Reinforced Concrete
C. ACI 332 Guide to Residential Cast-in-Place Concrete Construction
D. ACI 347 Guide for Formwork for Concrete
E. ASTM E84 Surface Burning Characteristics of Building Materials
F. ASTM D4595 Properties of Geotextiles by the Wide-Width Strip Method
G. ASTM D698 Moisture Density Relationship for Soils, Standard Method
1.05 SYSTEM DESCRIPTION
A. Vegetated wall cladding system consisting of stainless steel frame mounted using various fasteners to various wall systems and frame, ½” drip line irrigation system with pre-grown G-Sky Green Wall Panels that are 11 7/8” square hung on the frame.
1.06 VERIFICATION OF STRUCTURAL CAPACITY
A. Owner shall obtain prior, written confirmation from a professional engineer certifying that the structure is capable of bearing the additional load of G-Sky Green Wall Panels System. The owner understands that G-Sky is absolved of any and all liability in the event of collapse.
1.07 QUALITY ASSURANCE
A. There should be no deviation made from this specification or the detail drawings without prior written approval fourteen (14) days prior to the start of the project.
B. Before installation of the Green Wall Panels System, the wall shall be inspected by a technical representative of the wall system installer/manufacturer to determine the adequacy of the wall surface to accept the Green Wall Panels System.
C. Verification of the integrity of the wall for water tightness shall be the responsibility of the Owner.
D. The Green Wall Panels System components will be purchased from G-Sky.
E. Pre-Construction Conferences. A representative from G-Sky will meet with the necessary parties at the jobsite to review and discuss project conditions.
1.08 G-SKY REPRESENTATIVE
A. During installation, the contractor must permit and facilitate reasonable access to the work site at all times for a Technical Representative from G-Sky.
B. Upon completion of the installation, an inspection shall be conducted by a Technical Representative from G-Sky to ascertain that the Green Wall Panels System has been installed according to these specifications and details. This inspection is not intended to be a final inspection for the benefit of the owner but for the benefit of determining whether a warranty shall be issued.
1.09 EQUIVALENCY REQUESTS
A. No equivalencies shall be accepted to replace part or all of the Green Wall Panels System.
1.10 DELIVERY, STORAGE AND HANDLING
A. Deliver materials in original, unopened containers of original packaging, clearly labeled with manufacturer’s name, brand name, instruction for use, all identifying numbers, and related standards.
B. Before installation, materials must be stored in a dry and ventilated shelter that protects against freezing, inclement weather and any and all harmful substances. It is recommended that in winter months, the material be stored inside, at a temperature of +10°C (50°F).
C. Green Wall Panels plants must be stored in an area that will provide a healthy environment before installation. Depending on weather conditions, this may be outside or inside a temporary Greenhouse shelter.
D. Determine the area where the installation will begin. Leave the area clear and unobstructed when placing materials for installation. Ensure that the wall is easily accessible with no barriers obstructing access to the wall.
E. If installation of the Green Wall Panels System planted panels is not performed within two (2) days of delivery to the site, the panels must be stored in their original containers and watered every two (2) days through the entire balance of the storage period. A G-Sky representative must also be consulted about any additional instructions.
1.11 PROJECT CONDITIONS
A. Comply with G-Sky requirements regarding weather, substrate and other project conditions as specified in the Product Data Sheets.
B. Regularly clear the work site of any debris or other material that can hinder installation or system performance.
C. When moving materials or installing the Green Wall Panels System, protect exposed work surfaces to avoid damage. The contracted installer is fully responsible for any damage.
1.12 WARRANTY
A. All perishable materials, i.e. plants, that require water and nutrients in order to remain alive have no warranty. A maintenance agreement must be signed and entered into with G-Sky on every Green Wall. Under this agreement the terms for the plant replacement guarantee are stipulated.
B. All non-perishable materials include a 3 year warranty.
C. Warranties available from G-Sky:
a. System Warranties, includes labour. Covers material integrity of the Green Wall Panels System components.
Duration: 3 Year
D. Each warranty varies in scope and terms. Contact G-Sky for exact warranty terms and conditions to meet the specific project requirements.
1.13 GREEN WALL PANELS SYSTEM MAINTENANCE
A. Green Wall Panels System must be maintained under a maintenance contract signed and entered into with G-Sky.
PART II PRODUCTS
2.01 FRAME ANCHOR ASSEMBLY AND NEOPRENE WASHER
A. Description: torque controlled ⅜” x 3¾” stainless steel concrete/masonry bolt wedge anchor consisting of pre-assembled hexagon screw (stainless steel 304), washer (stainless steel 304), expansion sleeve (stainless steel 304), expansion core (stainless steel 304) and neoprene washer. For use with most concrete qualities C20/25 - C50/60. Can support minimum loads of 12.7kN (2,866lbf) in fair quality concrete, higher quality concrete will yield higher maximum loads. Controlled expansion for heavy loads.
1. Specified products: GW:WA38334 (Wedge Anchor Assembly) by G-Sky
GW:NPW12 (Neoprene Washer) by G-Sky
2.02 FRAME
A. Description: frame consisting of vertical support rails spaced either 300 or 600 apart (depending on height of the wall and ability to fit the wall dimensions) and horizontal panel rails 600 or 900mm lengths to hold panels. Four pre-drilled holes for mounting frames located 150mm from the edge of each vertical support in each corner. Made from stainless steel 304.
1. Specified product: GW:FR43 (4h x 3w 12 panel frame) by G-Sky
GW:FR42 (4h x 2w 8 panel frame) by G-Sky
GW:FR43L (4h x 3w 12 panel left corner frame)
by G-Sky
GW:FR43R (4h x 3w 12 panel right corner frame)
by G-Sky
2.03 PLANTED PANEL
A. Description: 300mm x 300mm panel housing with securing hooks on the back to hook onto a supporting frame and a guide groove on top for drip irrigation line. Made from polypropylene. Contains a proprietary growth medium encased in a non-woven, non-corrosive, non-flammable fabric. 9 or 13 plants are planted in each panel. In a custom panel, up to 25 plants can be planted in each panel.
1. Specified products: Euonymus japonicus ‘Microphyllus’
Euonymus japonicus ‘Microphyllus Aureovariegatus’
Euonymus japonicus ‘Microphyllus Albovariegatus’
Gaultheria procumbens
Polypodium glycrrhiza
Or other plant approved by G-Sky in writing.
2.04 IRRIGATION
A. Description: a 6” line-spaced 0.24GPH pressure compensating polyethylene drip irrigation system linked by PVC fittings controlled by a electromagnetic control valve, with a filter, pressure compensator, controller, moisture sensor, batteries, wires, fertilizer injection assembly and all other necessary accessories.
1. Specified products: IR:ICU by G-Sky
IR:TLCV26-6025 by G-Sky
And any associated fittings or water supply lines from supplied stub-out.
2.05 SECURING CLASP
A. Description: 600 or 900mm length stainless steel 304 clasp secured to the top of the frame to prevent lifting of panels from system.
1. Specified products: GW:CLASP by G-Sky
PART III EXECUTION
NOTE: Take all necessary action to maintain the envelope waterproofing warranty. The building envelope contractor must always be informed of the G-Sky Green Wall Panel system to be installed on the wall.
3.01 INSTALLATION SEASON
A. Unless otherwise permitted, green wall installation shall be done between April 1 and October 15, or when the outside ambient temperature is not below 10°C.
3.02 INSPECTION AND PREPARATION
A. Before beginning the installation, the owner’s representative and the contracted installer’s representatives must inspect and approve the wall conditions, including the waterproofing membrane, drainage routes, construction joints, etc.
B. The area to be greened shall be a smooth and even surface.
C. The area shall be thoroughly cleaned of debris that might interfere with the installation of frame.
D. Examine finish surfaces, grades and wall quality. Do no start wedge anchor installation work until unsatisfactory conditions are corrected.
E. In the event of non-compliance, a notice is to be provided to the contractor listing the corrective action to be taken. Starting the work will be taken to signify approval of the work conditions.
F. Ensure that all waterproofing, plumbing, woodworking and other work has been duly completed.
NOTE: Retain the following item for warranty.
3.03 SUPERVISION OF WORK BY CONTRACTOR
A. The building envelope contractor must supervise the installation of the Green Wall Panels System to ensure that no damage occurs to the wall that could affect the waterproofing warranty.
B. Immediately notify [the consultant] and [the owner] in writing in case of damage to the wall.
3.04 METHOD OF INSTALLATION
A. Install access scaffolding according to the safety guidelines and requirements as dictated by the local, regional, state or federal building council.
B. Ensure that the work site ambient temperature is at least 10°C and that the site ambient temperature is high enough after the vegetation is installed to prevent frost damage.
3.05 WORK EXECUTION RECOMMENDATIONS
A. Maintain equipment and tools used to install the Green Wall Panels in good condition.
B. Ensure that during use of equipment and tools, watertightness of the wall will not be compromised in any way.
3.06 FRAME & WEDGE ANCHOR INSTALLATION
NOTE: Coordinate with the original building envelope contractor to ensure that the watertightness of the wall will be maintained with the Green Wall Panels System installed.
No bolt installation should take place below -10°C (14°F). Make all efforts to ensure that installation takes place under dry conditions.
A. Prepare the surface.
1. Clean wall surface. Repair any cracks in the concrete and receive approval from a structural engineer that crack repair is sufficient to allow installation of Green Wall Panels System.
B. Install Frame
1. POSITION BOLTS: Begin by marking the starting frame area on the wall and the first bolt position as dictated on the frame drawings.
2. DRILL HOLE: Using an impact drill, drill a 5/8” hole 2 ½” deep when using WA:12700 and a 7/16” hole 1 ¾” deep when using WA:38334.
3. CLEAN HOLE: Clean the hole with a brush and then blow it out with a purging pump.
4. INSTALL ANCHOR: Drive the anchor into the hole until the surface collar is reached.
5. MARK FRAME BOLT PLACEMENTS: Position corresponding GW:FRxx to installed anchor and mark the next bolt placements.
6. INSTALL REMAINING ANCHORS: Repeat steps 2~4 for remaining bolt holes on frame.
7. INSTALL NEOPRENE WASHERS: Slide neoprene washers, GW:NPW12, over the installed wedge anchors.
8. ATTACH FRAME: align frame, slide over anchors and secure to anchors using supplied washer and bolts.
9. Repeat steps 1~7 for all frames.
3.07 PANELS AND IRRIGATION INSTALLATION
1. Feed GW:TLCV6025 line (part of irrigation kits) header from irrigation water source and control box to the base of the first panels to be installed.
2. Install a single planted panel to a frame and install PVC header line along side of panels.
3. Cut irrigation PVC header line and install a PVC Tee to feed GW:TLCV6025 along the top of the panels.
4. Cut GW:TLCV6025 line to leave 70mm of open line inbetween first emitter and GW:TLMLA connection to the end of the cut GW:TLCV6025.
5. Attach the assembled GW:TLMLA + GW:TLCV6025 to the PVC Tee.
6. Run GW:TLCV6025 line inside the top irrigation line groove of the planted panels.
7. Continue to install panels and feed irrigation line into the top groove until the end of the wall section is reached.
8. If the end of the wall section does not connect with another irrigation header line (see detailed irrigation spec), cut and double-back the line 70mm with GW:TL8.
9. If the end of the wall section connects with a header line, install header line Tee insert to GW:TLMLA and connect.
10. Repeat Steps 2~8 until all panels are installed.
(Note: the last line of panels irrigation header to drip line must be attached using a elbow insert and not a T insert.)
3.08 CLASP INSTALLATION (Optional)
1. Using included bolt and nut, align clasp to top of frame and attach GW:CLASP along the top line of planted panels to frame to secure panels from lifting.
3.09 GUTTER INSTALLATION (Optional)
1. Insert two typical gutter securing brackets onto the bottom edge of planted panels so as to fit the length of each elevation of panels. Insert at least one gutter securing bracket per every 3 panels.
2. Cut, cap and/or couple gutter to fit each elevation of panels, use typical eave gutter material.
3. Attached a downspout from the gutter to the designated drainage area as dictated by the drawings to expel water.
4. If necessary attach downspouts from one gutter to the next on cascading elevation systems.
NOTE: Due to the several drainage options, this is only a suggested option for a system without an additional drainage system built below the panels.
3.10 POST-INSTALLATION IRRIGATION AND INSPECTION PERIOD
A. The required Green Wall maintenance contract maintenance begins the day that plants arrive on site. The period between plant arrival on site and completion of the wall is known as the “Build-Out Maintenance”. The 4 week period immediately after completion is known as the “Transition Maintenance”. It is during these times that the plants are most vulnerable and require frequent visits by maintenance personnel to the site. During these periods, uninhibited access to the site must be provided by the Owner. After the “Transition Maintenance” period, “Regular Maintenance” will begin and the terms of the signed and entered maintenance contract will be in effect.
3.11 ACCEPTANCE
A. Inspection to determine acceptance of installation will be made by the Owner, upon Contractor’s request. Provide notification at least seven (7) working days before requested inspection date.
B. Upon acceptance, the Owner will assume maintenance tasks unless a maintenance contract is entered into forthwith.
3.12 CLEANING
A. Perform cleaning during installation of the work and upon completion of the work. Remove all excess materials, debris and equipment from the site. Repair any damage that has resulted from installation. .
NOTICE: G-Sky reserves the right to alter the composition and conditions of use of its materials without notice as knowledge and techniques evolve.
END OF SECTION